1. tunneling
2. the second-broken in excavating fields
3. drilll blast-holes in engineer
rock drill
rock head
Port: Mawei
Minimum Order Quantity: 20 Set/Sets up to you
Supply Ability: 1000 Set/Sets per Week more
Payment Terms: T/T,Western Union
Contact SupplierPackaging Detail: in wooden
Delivery Detail: 15day
1. It can be used to tunnel in mines, roads or tunnels.
2. It can be used to drill blast-holes in engineering.
3. It can be used in the second-broken in excavating fields.
4.well performed
5.convenient to use and mend
6.effective
7.light
rock drill
rock head