(1) Strip rebar rib first.
(2) Roll parallel thread on rebar end.
(3) Splice two pieces of threaded rebar with coupler.
Port: Tianjin Port / Beijing Airport
Minimum Order Quantity: 1 Set/Sets
Supply Ability: 10 Set/Sets per Day
Payment Terms: L/C,D/P,T/T,Western Union
Contact SupplierPackaging Detail: Wooden Case;CBM: 1.7;G.W.: 100kg.
Delivery Detail: Within One Week
Machine Parameters
| Model | JBG-40E | |
| Diameter of Rebar To Be Processed | 16mm-40mm | |
| MAX Thread Length | 200mm | |
| Rated Power | 4.04KW | |
| Rated Current | 8.46A | |
| Electrics | AC 3P/N/PE 380V 50Hz | |
| Rotated Speed | 40-62r/min | |
| Dimension L*W*H | 1200mm*600mm*1300mm | |
| G/W | 440kg | |
| Processing Capability | It takes 30-40 seconds to finish one rebar thread sector. It can make 800-1000 pcs every day / one machine. | |
Package | Wooden Case | CBM: 140cm*90cm*130cm |
| G.W.: 100kg | ||
| Notes | Custom machine is available as per your requirement. | |
Roller Thread Pitch (p=mm) and Rebar Specification
p=2/p=2.5 Φ12-Φ22
p=2.5/p=3 Φ25-Φ32
p=3/p=3.5 Φ36-Φ40
Remark: 60°,75°thread angle free to chose.
Rollers Dimension could be customized.